住房和城乡建设部2021年第153号:关于发布《冷轧电工钢工程设计规范》等9项工程建设标准英文版的公告现行
资源类型:政策法规
发布日期:2021-08-30
实施日期:2021-08-30
废止日期:-
入库日期:2022-07-15
主编单位:
收藏
- 简介
- 目录
中华人民共和国住房和城乡建设部公告2021年第153号
1
1 General provisions
6
2 Terms and abbreviations
7
2.1 Terms
7
2.2 Abbreviations
9
3 Basic requirements
10
4 Process and equipment
11
4.1 General provisions
11
4.2 Process
11
4.3 Equipment selection
11
4.4 Shop layout arrangement
11
4.5 Shop transportation
12
5 General layout and transportation
14
6 Power distribution
16
6.1 Power supply
16
6.2 Power distribution system
16
6.3 Power distribution wires
17
7 Electrical drive
18
7.1 Low voltage distribution
18
7.2 Electrical drive
18
7.3 Electrical engineering
18
8 Automation instruments
20
8.1 Automation instrument equipment
20
8.2 Instrument power source
21
8.3 Instrument engineering
22
9 Automation system
23
9.1 General provisions
23
9.2 Basic automation system(L1)
23
9.3 Process automation system(L2)
24
9.4 Manufacturing execution system (MES)
24
9.5 Automation engineering
25
10 Telecommunication
26
10.1 Telephone system
26
10.2 Intercom system
26
10.3 Radio system
26
10.4 Industrial television system
26
10.5 Generic cabling system
27
11 Utilities
28
11.1 General provisions
28
11.2 Machine repair facilities
28
11.3 Testing facilities
29
11.4 Combustion gas facilities
30
11.5 Heating facilities
32
11.6 Water supply and drainage facilities
32
11.7 Ventilation facilities
34
11.8 Piping design
36
12 Architecture
39
12.1 General provisions
39
12.2 Main shop
39
12.3 Architecture of utilities
40
12.4 Architecture of office and living facilities
40
13 Structure
41
13.1 General provisions
41
13.2 Structural type selection and arrangements
41
13.3 Design load
41
13.4 Selection of material
42
13.5 Construction measures
42
14 Energy conservation and environmental protection
43
14.1 Energy conservation
43
14.2 Environmental protection
43
15 Safety and fire fighting
45
15.1 Safety and industrial hygieney
45
15.2 Safety and fire fighting
47
Explanation of wording in this code
50
List of quoted standards
51
1 General provisions
58
2 Terms
59
3 Basic requirements
60
4 Small-sized hot-rolled section steels
61
4.1 Production scale and products
61
4.2 Starting material
61
4.3 Production process
62
4.4 Process equipment
63
4.5 Work duty work time and load rate
63
4.6 Shop layout
63
5 Medium-sized hot-rolled section steels
65
5.1 Production scale and products
65
5.2 Starting material
65
5.3 Production process
66
5.4 Process equipment
66
5.5 Work duty, work time and load rate
67
5.6 Shop layout
67
6 Medium-sized hot-rolled sfeel bars
68
6.1 Production scalc and products
68
6.2 Starting material
68
6.3 Production process
68
6.4 Process equipment
69
6.5 Work duty,work time and load rate
69
6.6 Shop layout
69
7 Large-sized hot-rolled section steels
71
7.1 Production scale and products
71
7.2 Starting material
71
7.3 Production process
71
7.4 Process equipment
72
7.5 Work duty,work time and load rate
73
7.6 Shop layout
73
8 Large-sized hot-rolled steel bars
74
8.1 Production scale and products
74
8.2 Starting material
74
8.3 Production process
74
8.4 Process equipment
75
8.5 Work duty,work time and load rate
75
8.6 Shop layout
75
9 Power supply and distribution system
77
10 Electrical drive and automation system
78
10.1 Electrical drive
78
10.2 Automation instrumentation
78
10.3 Automation system
79
11 Telecommunication
81
11.1 Telephone system
81
11.2 Wired intercom system
81
11.3 Wireless intercom system
81
12 Utilities
83
12.1 Roll shop facilities
83
12.2 Laboratory facilities
84
12.3 Fuel gas facilities
84
12.4 Thermal power facilities
85
12.5 Water supply and drainage facilities
86
12.6 Heating ventilation and air conditioning facilities
87
13 Architecture and structure
89
13.1 General requirements
89
13.2 Main building
89
14 Safety,health and environmental protection
91
14.1 General requirements
91
14.2 Safety
91
14.3 Health
92
14.4 Envirolmcntal projtection
92
Explanation of wording in this code
94
List of quoted standards
95
1 General provisions
101
2 Terms
102
3 Basic requirements
104
4 Process design
105
4.1 Process parameters
105
4.2 Configurations
106
4.3 Process arrangement
107
5 Process equipment and piping
108
5.1 General regulations
108
5.2 Equipment
109
5.3 Piping
111
5.4 Insulation
112
6 Electrical engineering and automation
113
6.1 Low voltage distribution
113
6.2 Electrical drive
113
6.3 Process detection and control instruments
113
6.4 Basic automation system
116
6.5 Telecommunication facilities
116
7 Plant design
118
7.1 General requirements
118
7.2 Master plan
118
7.3 Water supply and drainage facilities
118
7.4 Combustion gas facilities
118
7.5 Heating facilities
119
7.6 Ventilation facilities
119
7.7 Laboratory facilities
119
7.8 Architecture and structure
119
7.9 Anti-corrosion design
120
8 Construction and installation
121
8.1 General requirements
121
8.2 Civil construction
121
8.3 Equipment installation
122
8.4 Brick lining construction
122
8.5 Piping installation
124
9 Commissioning and assessment
126
9.1 General regulations
126
9.2 Commissioning
126
9.3 Assessment
127
10 Operation and maintenance
128
11 Energy conservation and environment protection
129
12 Safety and fire extinguish
130
Explanation of wording in this code
131
List of quoted standards
132
1 General provisions
137
2 Terms
138
3 Basic requirements
140
4 Design of process system
141
4.1 General requirements
141
4.2 Process
141
4.3 Design parameters
142
5 Equipment
144
5.1 General requirements
144
5.2 Non-standard equipment
144
5.3 General equipment
146
5.4 Auxiliary equipment
147
6 Technological pipeline
148
6.1 General requirementsy
148
6.2 Pipe arrangement
148
6.3 Process parameters of pipe
149
6.4 Auxiliary facilities of pipc
149
6.5 Pipe inspection and pressure test
151
6.6 Pipe surface treatment and coating
151
7 Auxiliary facilities
153
7.1 General requirements
153
7.2 Electrical and lightning protection earthing
153
7.3 Automatic monitoring and control
154
7.4 Fire fighting and communication
155
7.5 Water supply and drainage
155
7.6 Heating and ventilation
156
7.7 Building and structure
156
8 Test run
157
8.1 General requirements
157
8.2 Test run
157
9 Safety and environmental protection
159
9.1 General requirements
159
9.2 Safety
159
9.3 Environmental protection
160
Explanation of wording in this code
161
List of quoted standards
162
1 General provisions
167
2 Terms and symbols
168
2.1 Terms
168
2.2 Symbols
168
3 Groundwater control
170
3.1 General requirements
170
3.2 Groundwater control methods
170
3.3 Hydrogeological calculations
171
3.4 Dewatering project layout
172
3.5 Dewatering equipment and well filter
172
3.6 Dewatering pipes
174
3.7 Observation of groundwater regime
174
4 Surface water prevention and open-pit drainage
176
4.1 Open-pit drainage
176
4.2 Surface water prevention
178
5 Auxiliary projects
180
5.1 Power supply and automatic control
180
5.2 Construction and ventilation
180
5.3 Dewatering and drainage dusposal
181
6 Energy conservation and emission reduction and integrated utilization
182
6.1 General requirements
182
6.2 Energy conservation
182
6.3 Emission reduction and integrated utilization
183
7 Security protection
184
Explanation of wording in this code
185
List of quoted standards
186
1 General provisions
189
2 Terms
190
3 Basic requirements
191
4 Information infrastructures
192
4.1 Overall architecture
192
4.2 Transmission network
192
4.3 Platform hardware
193
4.4 Platform software
194
4.5 Data center
194
4.6 Dispatch monitoring center
195
5 Mine production system
196
5.1 General requirements
196
5.2 Coal-mining face and development heading system
196
5.3 Ventilation and safety system
197
5.4 Hoisting and transportation system
198
5.5 Auxiliary production system
198
5.6 Power supply and distribution system
201
5.7 Information guidance and release system
202
5.8 Communication system
202
5.9 Environmental system
202
6 Mine management system
204
6.1 One-stop portal management
204
6.2 Mine safery management system
204
6.3 Mine production management system
206
6.4 Mine management system
207
6.5 Decision support system
208
7 Information security
209
7.1 General requirements
209
7.2 System security
209
7.3 Network security
209
7.4 Application security
209
Explanation of wording in this standard
211
List of quoted standards
212
1 General provisions
217
2 Basic requirements
218
2.1 Seismic precautionary classification
218
2.2 Structural system
218
2.3 Isolation and energy-dissipation
219
2.4 Materials and construction
219
3 Geotechnical engineering
220
3.1 General requirements
220
3.2 Liquefaction evaluation
220
3.3 Subsidence seismic evaluation
220
3.4 Active fault
221
4 General plan and outside road
222
4.1 Site selection
222
4.2 General plan layout
222
4.3 Road and bridge
222
5 Underground engineering
224
5.1 General requirements
224
5.2 Mine support
224
5.3 Emergency exit
224
5.4 Underground main drainage
224
5.5 Hoist facilities
225
6 Ground engineering
226
6.1 General requirements
226
6.2 Head frame
226
6.3 Shaft tower
228
6.4 Hoist building
230
6.5 Lodge room
231
7 Preparation plant engineering
232
7.1 Process layout
232
7.2 Building Structure
232
7.3 Details of design
235
7.4 Trestle bridge
235
7.5 Coal bunker
236
8 Power supply distribution and integrated informatization
238
8.1 General requirements
238
8.2 Power distribution
238
8.3 The installation of power distribution equipment
239
8.4 Integrated informatization
239
9 Water supply and drainage,heating and gavS vStorage and distribution
240
9.1 Source of water
240
9.2 Water supply and drainage
240
9.3 Heating
241
9.4 Gas storage and distribution
242
Explanation of wording in this code
243
List of quoted standards
244
1 General provisions
249
2 Basic requirements
250
3 Raw coal receive and storage
252
3.1 Receive coal
252
3.2 Raw coal storage
252
4 Screening,impurity extraction and crushing
254
4.1 Screening
254
4.2 Impurity extraction
254
4.3 Crushing
255
5 Coal preparation
256
5.1 General requirements
256
5.2 Jigging
258
5.3 Dense medium separation
259
5.4 Froth flotation
260
5.5 Other coal preparation methods
261
6 Dewatering,freeze-proofing and dryihg
263
6.1 Dewatering
263
6.2 Freeze-proofing and drying
265
7 Coal slurry processing
267
7.1 Coal slugy Gonveying and coarse slime hydraulic classification
267
7.2 Setting and thickening for slimes slurry
268
7.3 Slurry processing
270
8 Storing and loading for coal production
272
9 GeneraPutilization of reject and coal slurry
273
10 Measure and examination of coal
274
11 Repairing for electro-mechanical
275
12 General layout
276
13 Surface transportation
280
13.1 General requirements
280
13.2 Selection of transportation modes
280
13.3 Railway transportation
281
13.4 Road transportation
283
13.5 Other transportation modes
283
14 Electric
284
14.1 Power supply
284
14.2 Power distribution
285
14.3 Lighting
286
14.4 Lightning protection and grounding
287
14.5 Control
288
14.6 Automation
290
14.7 Monitoring and protecting
290
14.8 Communication
291
14.9 Industrial television system
291
14.10 Control network and computer information management system
291
15 Water supply and drainage
293
15.1 Source of water
293
15.2 Outdoor water supply and drainage
293
15.3 Indoor water supply and drainage
297
16 Heating and ventilation
298
16.1 Heating
298
16.2 Ventilation and dust extraction
302
16.3 Heat-supply pipeline in outdoor
303
17 Buildings and structures
304
17.1 General requirements
304
17.2 Main buildings
305
17.3 Ancillary buildings
307
18 Techno-economy
308
18.1 General requirements
308
18.2 Manpower quota
308
18.3 Investment estimation and budget estimption
309
18.4 Economic evaluation
309
18.5 Technical and economic comprehensive evaluation
310
Appendix A Index of ancillary building area for coal preparation plant
311
Explanation of wording in this code
312
List of quoted standards
313
1 General provisions
318
2 Terms
319
3 Basic requirements
321
4 Allowable value of vibration of precision instrument and equipment
322
4.1 General requirements
322
4.2 Allowance value of vibration
322
5 Planning and design
325
5.1 General requirements
325
5.2 Anli-microvibration distance
325
5.3 Plant layout
327
6 Anti-microvibration of building structures
328
6.1 General requirements
328
6.2 Anti-microvibration measures
329
6.3 Microvibration checking calculation
331
7 Isolation design
334
7.1 General requirementst
334
7.2 Active isolation
334
7.3 Passive isolation
335
8 Acceptance of constructional quality of anti-microvibration engineering
337
8.1 General requirements
337
8.2 Acceptance of coiutfructional quality of foundation treatment
338
8.3 Accfptfnce ot constfructional quality of cubage conctete anti-microvibration foundation
338
8.4 ofconstructionalqualityofstructure of anrl-microvibration engineering
338
8.5 Acceptance of constructional quality of isolation engineering of precision instrument and equipment
339
8.6 Acceptance of constructional quality of isolation engineering of power equipment and pipe
341
8.7 Acceptance of constructional quality of anti-microvibration engineering
342
Appendix A Microvibration testing analysis
344
Appendix B Superposition calculation of different and multiple sources vibration
349
Explanation of wording in this code
351
List of quoted standards
352
图书评论
暂无相关数据
我也要评论