• 中华人民共和国住房和城乡建设部公告2021年第153号
  • 1 General provisions
  • 2 Terms and abbreviations
  • 2.1 Terms
  • 2.2 Abbreviations
  • 3 Basic requirements
  • 4 Process and equipment
  • 4.1 General provisions
  • 4.2 Process
  • 4.3 Equipment selection
  • 4.4 Shop layout arrangement
  • 4.5 Shop transportation
  • 5 General layout and transportation
  • 6 Power distribution
  • 6.1 Power supply
  • 6.2 Power distribution system
  • 6.3 Power distribution wires
  • 7 Electrical drive
  • 7.1 Low voltage distribution
  • 7.2 Electrical drive
  • 7.3 Electrical engineering
  • 8 Automation instruments
  • 8.1 Automation instrument equipment
  • 8.2 Instrument power source
  • 8.3 Instrument engineering
  • 9 Automation system
  • 9.1 General provisions
  • 9.2 Basic automation system(L1)
  • 9.3 Process automation system(L2)
  • 9.4 Manufacturing execution system (MES)
  • 9.5 Automation engineering
  • 10 Telecommunication
  • 10.1 Telephone system
  • 10.2 Intercom system
  • 10.3 Radio system
  • 10.4 Industrial television system
  • 10.5 Generic cabling system
  • 11 Utilities
  • 11.1 General provisions
  • 11.2 Machine repair facilities
  • 11.3 Testing facilities
  • 11.4 Combustion gas facilities
  • 11.5 Heating facilities
  • 11.6 Water supply and drainage facilities
  • 11.7 Ventilation facilities
  • 11.8 Piping design
  • 12 Architecture
  • 12.1 General provisions
  • 12.2 Main shop
  • 12.3 Architecture of utilities
  • 12.4 Architecture of office and living facilities
  • 13 Structure
  • 13.1 General provisions
  • 13.2 Structural type selection and arrangements
  • 13.3 Design load
  • 13.4 Selection of material
  • 13.5 Construction measures
  • 14 Energy conservation and environmental protection
  • 14.1 Energy conservation
  • 14.2 Environmental protection
  • 15 Safety and fire fighting
  • 15.1 Safety and industrial hygieney
  • 15.2 Safety and fire fighting
  • Explanation of wording in this code
  • List of quoted standards
  • 1 General provisions
  • 2 Terms
  • 3 Basic requirements
  • 4 Small-sized hot-rolled section steels
  • 4.1 Production scale and products
  • 4.2 Starting material
  • 4.3 Production process
  • 4.4 Process equipment
  • 4.5 Work duty work time and load rate
  • 4.6 Shop layout
  • 5 Medium-sized hot-rolled section steels
  • 5.1 Production scale and products
  • 5.2 Starting material
  • 5.3 Production process
  • 5.4 Process equipment
  • 5.5 Work duty, work time and load rate
  • 5.6 Shop layout
  • 6 Medium-sized hot-rolled sfeel bars
  • 6.1 Production scalc and products
  • 6.2 Starting material
  • 6.3 Production process
  • 6.4 Process equipment
  • 6.5 Work duty,work time and load rate
  • 6.6 Shop layout
  • 7 Large-sized hot-rolled section steels
  • 7.1 Production scale and products
  • 7.2 Starting material
  • 7.3 Production process
  • 7.4 Process equipment
  • 7.5 Work duty,work time and load rate
  • 7.6 Shop layout
  • 8 Large-sized hot-rolled steel bars
  • 8.1 Production scale and products
  • 8.2 Starting material
  • 8.3 Production process
  • 8.4 Process equipment
  • 8.5 Work duty,work time and load rate
  • 8.6 Shop layout
  • 9 Power supply and distribution system
  • 10 Electrical drive and automation system
  • 10.1 Electrical drive
  • 10.2 Automation instrumentation
  • 10.3 Automation system
  • 11 Telecommunication
  • 11.1 Telephone system
  • 11.2 Wired intercom system
  • 11.3 Wireless intercom system
  • 12 Utilities
  • 12.1 Roll shop facilities
  • 12.2 Laboratory facilities
  • 12.3 Fuel gas facilities
  • 12.4 Thermal power facilities
  • 12.5 Water supply and drainage facilities
  • 12.6 Heating ventilation and air conditioning facilities
  • 13 Architecture and structure
  • 13.1 General requirements
  • 13.2 Main building
  • 14 Safety,health and environmental protection
  • 14.1 General requirements
  • 14.2 Safety
  • 14.3 Health
  • 14.4 Envirolmcntal projtection
  • Explanation of wording in this code
  • List of quoted standards
  • 1 General provisions
  • 2 Terms
  • 3 Basic requirements
  • 4 Process design
  • 4.1 Process parameters
  • 4.2 Configurations
  • 4.3 Process arrangement
  • 5 Process equipment and piping
  • 5.1 General regulations
  • 5.2 Equipment
  • 5.3 Piping
  • 5.4 Insulation
  • 6 Electrical engineering and automation
  • 6.1 Low voltage distribution
  • 6.2 Electrical drive
  • 6.3 Process detection and control instruments
  • 6.4 Basic automation system
  • 6.5 Telecommunication facilities
  • 7 Plant design
  • 7.1 General requirements
  • 7.2 Master plan
  • 7.3 Water supply and drainage facilities
  • 7.4 Combustion gas facilities
  • 7.5 Heating facilities
  • 7.6 Ventilation facilities
  • 7.7 Laboratory facilities
  • 7.8 Architecture and structure
  • 7.9 Anti-corrosion design
  • 8 Construction and installation
  • 8.1 General requirements
  • 8.2 Civil construction
  • 8.3 Equipment installation
  • 8.4 Brick lining construction
  • 8.5 Piping installation
  • 9 Commissioning and assessment
  • 9.1 General regulations
  • 9.2 Commissioning
  • 9.3 Assessment
  • 10 Operation and maintenance
  • 11 Energy conservation and environment protection
  • 12 Safety and fire extinguish
  • Explanation of wording in this code
  • List of quoted standards
  • 1 General provisions
  • 2 Terms
  • 3 Basic requirements
  • 4 Design of process system
  • 4.1 General requirements
  • 4.2 Process
  • 4.3 Design parameters
  • 5 Equipment
  • 5.1 General requirements
  • 5.2 Non-standard equipment
  • 5.3 General equipment
  • 5.4 Auxiliary equipment
  • 6 Technological pipeline
  • 6.1 General requirementsy
  • 6.2 Pipe arrangement
  • 6.3 Process parameters of pipe
  • 6.4 Auxiliary facilities of pipc
  • 6.5 Pipe inspection and pressure test
  • 6.6 Pipe surface treatment and coating
  • 7 Auxiliary facilities
  • 7.1 General requirements
  • 7.2 Electrical and lightning protection earthing
  • 7.3 Automatic monitoring and control
  • 7.4 Fire fighting and communication
  • 7.5 Water supply and drainage
  • 7.6 Heating and ventilation
  • 7.7 Building and structure
  • 8 Test run
  • 8.1 General requirements
  • 8.2 Test run
  • 9 Safety and environmental protection
  • 9.1 General requirements
  • 9.2 Safety
  • 9.3 Environmental protection
  • Explanation of wording in this code
  • List of quoted standards
  • 1 General provisions
  • 2 Terms and symbols
  • 2.1 Terms
  • 2.2 Symbols
  • 3 Groundwater control
  • 3.1 General requirements
  • 3.2 Groundwater control methods
  • 3.3 Hydrogeological calculations
  • 3.4 Dewatering project layout
  • 3.5 Dewatering equipment and well filter
  • 3.6 Dewatering pipes
  • 3.7 Observation of groundwater regime
  • 4 Surface water prevention and open-pit drainage
  • 4.1 Open-pit drainage
  • 4.2 Surface water prevention
  • 5 Auxiliary projects
  • 5.1 Power supply and automatic control
  • 5.2 Construction and ventilation
  • 5.3 Dewatering and drainage dusposal
  • 6 Energy conservation and emission reduction and integrated utilization
  • 6.1 General requirements
  • 6.2 Energy conservation
  • 6.3 Emission reduction and integrated utilization
  • 7 Security protection
  • Explanation of wording in this code
  • List of quoted standards
  • 1 General provisions
  • 2 Terms
  • 3 Basic requirements
  • 4 Information infrastructures
  • 4.1 Overall architecture
  • 4.2 Transmission network
  • 4.3 Platform hardware
  • 4.4 Platform software
  • 4.5 Data center
  • 4.6 Dispatch monitoring center
  • 5 Mine production system
  • 5.1 General requirements
  • 5.2 Coal-mining face and development heading system
  • 5.3 Ventilation and safety system
  • 5.4 Hoisting and transportation system
  • 5.5 Auxiliary production system
  • 5.6 Power supply and distribution system
  • 5.7 Information guidance and release system
  • 5.8 Communication system
  • 5.9 Environmental system
  • 6 Mine management system
  • 6.1 One-stop portal management
  • 6.2 Mine safery management system
  • 6.3 Mine production management system
  • 6.4 Mine management system
  • 6.5 Decision support system
  • 7 Information security
  • 7.1 General requirements
  • 7.2 System security
  • 7.3 Network security
  • 7.4 Application security
  • Explanation of wording in this standard
  • List of quoted standards
  • 1 General provisions
  • 2 Basic requirements
  • 2.1 Seismic precautionary classification
  • 2.2 Structural system
  • 2.3 Isolation and energy-dissipation
  • 2.4 Materials and construction
  • 3 Geotechnical engineering
  • 3.1 General requirements
  • 3.2 Liquefaction evaluation
  • 3.3 Subsidence seismic evaluation
  • 3.4 Active fault
  • 4 General plan and outside road
  • 4.1 Site selection
  • 4.2 General plan layout
  • 4.3 Road and bridge
  • 5 Underground engineering
  • 5.1 General requirements
  • 5.2 Mine support
  • 5.3 Emergency exit
  • 5.4 Underground main drainage
  • 5.5 Hoist facilities
  • 6 Ground engineering
  • 6.1 General requirements
  • 6.2 Head frame
  • 6.3 Shaft tower
  • 6.4 Hoist building
  • 6.5 Lodge room
  • 7 Preparation plant engineering
  • 7.1 Process layout
  • 7.2 Building Structure
  • 7.3 Details of design
  • 7.4 Trestle bridge
  • 7.5 Coal bunker
  • 8 Power supply distribution and integrated informatization
  • 8.1 General requirements
  • 8.2 Power distribution
  • 8.3 The installation of power distribution equipment
  • 8.4 Integrated informatization
  • 9 Water supply and drainage,heating and gavS vStorage and distribution
  • 9.1 Source of water
  • 9.2 Water supply and drainage
  • 9.3 Heating
  • 9.4 Gas storage and distribution
  • Explanation of wording in this code
  • List of quoted standards
  • 1 General provisions
  • 2 Basic requirements
  • 3 Raw coal receive and storage
  • 3.1 Receive coal
  • 3.2 Raw coal storage
  • 4 Screening,impurity extraction and crushing
  • 4.1 Screening
  • 4.2 Impurity extraction
  • 4.3 Crushing
  • 5 Coal preparation
  • 5.1 General requirements
  • 5.2 Jigging
  • 5.3 Dense medium separation
  • 5.4 Froth flotation
  • 5.5 Other coal preparation methods
  • 6 Dewatering,freeze-proofing and dryihg
  • 6.1 Dewatering
  • 6.2 Freeze-proofing and drying
  • 7 Coal slurry processing
  • 7.1 Coal slugy Gonveying and coarse slime hydraulic classification
  • 7.2 Setting and thickening for slimes slurry
  • 7.3 Slurry processing
  • 8 Storing and loading for coal production
  • 9 GeneraPutilization of reject and coal slurry
  • 10 Measure and examination of coal
  • 11 Repairing for electro-mechanical
  • 12 General layout
  • 13 Surface transportation
  • 13.1 General requirements
  • 13.2 Selection of transportation modes
  • 13.3 Railway transportation
  • 13.4 Road transportation
  • 13.5 Other transportation modes
  • 14 Electric
  • 14.1 Power supply
  • 14.2 Power distribution
  • 14.3 Lighting
  • 14.4 Lightning protection and grounding
  • 14.5 Control
  • 14.6 Automation
  • 14.7 Monitoring and protecting
  • 14.8 Communication
  • 14.9 Industrial television system
  • 14.10 Control network and computer information management system
  • 15 Water supply and drainage
  • 15.1 Source of water
  • 15.2 Outdoor water supply and drainage
  • 15.3 Indoor water supply and drainage
  • 16 Heating and ventilation
  • 16.1 Heating
  • 16.2 Ventilation and dust extraction
  • 16.3 Heat-supply pipeline in outdoor
  • 17 Buildings and structures
  • 17.1 General requirements
  • 17.2 Main buildings
  • 17.3 Ancillary buildings
  • 18 Techno-economy
  • 18.1 General requirements
  • 18.2 Manpower quota
  • 18.3 Investment estimation and budget estimption
  • 18.4 Economic evaluation
  • 18.5 Technical and economic comprehensive evaluation
  • Appendix A Index of ancillary building area for coal preparation plant
  • Explanation of wording in this code
  • List of quoted standards
  • 1 General provisions
  • 2 Terms
  • 3 Basic requirements
  • 4 Allowable value of vibration of precision instrument and equipment
  • 4.1 General requirements
  • 4.2 Allowance value of vibration
  • 5 Planning and design
  • 5.1 General requirements
  • 5.2 Anli-microvibration distance
  • 5.3 Plant layout
  • 6 Anti-microvibration of building structures
  • 6.1 General requirements
  • 6.2 Anti-microvibration measures
  • 6.3 Microvibration checking calculation
  • 7 Isolation design
  • 7.1 General requirementst
  • 7.2 Active isolation
  • 7.3 Passive isolation
  • 8 Acceptance of constructional quality of anti-microvibration engineering
  • 8.1 General requirements
  • 8.2 Acceptance of coiutfructional quality of foundation treatment
  • 8.3 Accfptfnce ot constfructional quality of cubage conctete anti-microvibration foundation
  • 8.4 ofconstructionalqualityofstructure of anrl-microvibration engineering
  • 8.5 Acceptance of constructional quality of isolation engineering of precision instrument and equipment
  • 8.6 Acceptance of constructional quality of isolation engineering of power equipment and pipe
  • 8.7 Acceptance of constructional quality of anti-microvibration engineering
  • Appendix A Microvibration testing analysis
  • Appendix B Superposition calculation of different and multiple sources vibration
  • Explanation of wording in this code
  • List of quoted standards