中华人民共和国住房和城乡建设部公告2021年第153号
1 General provisions
2 Terms and abbreviations
2.1 Terms
2.2 Abbreviations
3 Basic requirements
4 Process and equipment
4.1 General provisions
4.2 Process
4.3 Equipment selection
4.4 Shop layout arrangement
4.5 Shop transportation
5 General layout and transportation
6 Power distribution
6.1 Power supply
6.2 Power distribution system
6.3 Power distribution wires
7 Electrical drive
7.1 Low voltage distribution
7.2 Electrical drive
7.3 Electrical engineering
8 Automation instruments
8.1 Automation instrument equipment
8.2 Instrument power source
8.3 Instrument engineering
9 Automation system
9.1 General provisions
9.2 Basic automation system(L1)
9.3 Process automation system(L2)
9.4 Manufacturing execution system (MES)
9.5 Automation engineering
10 Telecommunication
10.1 Telephone system
10.2 Intercom system
10.3 Radio system
10.4 Industrial television system
10.5 Generic cabling system
11 Utilities
11.1 General provisions
11.2 Machine repair facilities
11.3 Testing facilities
11.4 Combustion gas facilities
11.5 Heating facilities
11.6 Water supply and drainage facilities
11.7 Ventilation facilities
11.8 Piping design
12 Architecture
12.1 General provisions
12.2 Main shop
12.3 Architecture of utilities
12.4 Architecture of office and living facilities
13 Structure
13.1 General provisions
13.2 Structural type selection and arrangements
13.3 Design load
13.4 Selection of material
13.5 Construction measures
14 Energy conservation and environmental protection
14.1 Energy conservation
14.2 Environmental protection
15 Safety and fire fighting
15.1 Safety and industrial hygieney
15.2 Safety and fire fighting
Explanation of wording in this code
List of quoted standards
1 General provisions
2 Terms
3 Basic requirements
4 Small-sized hot-rolled section steels
4.1 Production scale and products
4.2 Starting material
4.3 Production process
4.4 Process equipment
4.5 Work duty work time and load rate
4.6 Shop layout
5 Medium-sized hot-rolled section steels
5.1 Production scale and products
5.2 Starting material
5.3 Production process
5.4 Process equipment
5.5 Work duty, work time and load rate
5.6 Shop layout
6 Medium-sized hot-rolled sfeel bars
6.1 Production scalc and products
6.2 Starting material
6.3 Production process
6.4 Process equipment
6.5 Work duty,work time and load rate
6.6 Shop layout
7 Large-sized hot-rolled section steels
7.1 Production scale and products
7.2 Starting material
7.3 Production process
7.4 Process equipment
7.5 Work duty,work time and load rate
7.6 Shop layout
8 Large-sized hot-rolled steel bars
8.1 Production scale and products
8.2 Starting material
8.3 Production process
8.4 Process equipment
8.5 Work duty,work time and load rate
8.6 Shop layout
9 Power supply and distribution system
10 Electrical drive and automation system
10.1 Electrical drive
10.2 Automation instrumentation
10.3 Automation system
11 Telecommunication
11.1 Telephone system
11.2 Wired intercom system
11.3 Wireless intercom system
12 Utilities
12.1 Roll shop facilities
12.2 Laboratory facilities
12.3 Fuel gas facilities
12.4 Thermal power facilities
12.5 Water supply and drainage facilities
12.6 Heating ventilation and air conditioning facilities
13 Architecture and structure
13.1 General requirements
13.2 Main building
14 Safety,health and environmental protection
14.1 General requirements
14.2 Safety
14.3 Health
14.4 Envirolmcntal projtection
Explanation of wording in this code
List of quoted standards
1 General provisions
2 Terms
3 Basic requirements
4 Process design
4.1 Process parameters
4.2 Configurations
4.3 Process arrangement
5 Process equipment and piping
5.1 General regulations
5.2 Equipment
5.3 Piping
5.4 Insulation
6 Electrical engineering and automation
6.1 Low voltage distribution
6.2 Electrical drive
6.3 Process detection and control instruments
6.4 Basic automation system
6.5 Telecommunication facilities
7 Plant design
7.1 General requirements
7.2 Master plan
7.3 Water supply and drainage facilities
7.4 Combustion gas facilities
7.5 Heating facilities
7.6 Ventilation facilities
7.7 Laboratory facilities
7.8 Architecture and structure
7.9 Anti-corrosion design
8 Construction and installation
8.1 General requirements
8.2 Civil construction
8.3 Equipment installation
8.4 Brick lining construction
8.5 Piping installation
9 Commissioning and assessment
9.1 General regulations
9.2 Commissioning
9.3 Assessment
10 Operation and maintenance
11 Energy conservation and environment protection
12 Safety and fire extinguish
Explanation of wording in this code
List of quoted standards
1 General provisions
2 Terms
3 Basic requirements
4 Design of process system
4.1 General requirements
4.2 Process
4.3 Design parameters
5 Equipment
5.1 General requirements
5.2 Non-standard equipment
5.3 General equipment
5.4 Auxiliary equipment
6 Technological pipeline
6.1 General requirementsy
6.2 Pipe arrangement
6.3 Process parameters of pipe
6.4 Auxiliary facilities of pipc
6.5 Pipe inspection and pressure test
6.6 Pipe surface treatment and coating
7 Auxiliary facilities
7.1 General requirements
7.2 Electrical and lightning protection earthing
7.3 Automatic monitoring and control
7.4 Fire fighting and communication
7.5 Water supply and drainage
7.6 Heating and ventilation
7.7 Building and structure
8 Test run
8.1 General requirements
8.2 Test run
9 Safety and environmental protection
9.1 General requirements
9.2 Safety
9.3 Environmental protection
Explanation of wording in this code
List of quoted standards
1 General provisions
2 Terms and symbols
2.1 Terms
2.2 Symbols
3 Groundwater control
3.1 General requirements
3.2 Groundwater control methods
3.3 Hydrogeological calculations
3.4 Dewatering project layout
3.5 Dewatering equipment and well filter
3.6 Dewatering pipes
3.7 Observation of groundwater regime
4 Surface water prevention and open-pit drainage
4.1 Open-pit drainage
4.2 Surface water prevention
5 Auxiliary projects
5.1 Power supply and automatic control
5.2 Construction and ventilation
5.3 Dewatering and drainage dusposal
6 Energy conservation and emission reduction and integrated utilization
6.1 General requirements
6.2 Energy conservation
6.3 Emission reduction and integrated utilization
7 Security protection
Explanation of wording in this code
List of quoted standards
1 General provisions
2 Terms
3 Basic requirements
4 Information infrastructures
4.1 Overall architecture
4.2 Transmission network
4.3 Platform hardware
4.4 Platform software
4.5 Data center
4.6 Dispatch monitoring center
5 Mine production system
5.1 General requirements
5.2 Coal-mining face and development heading system
5.3 Ventilation and safety system
5.4 Hoisting and transportation system
5.5 Auxiliary production system
5.6 Power supply and distribution system
5.7 Information guidance and release system
5.8 Communication system
5.9 Environmental system
6 Mine management system
6.1 One-stop portal management
6.2 Mine safery management system
6.3 Mine production management system
6.4 Mine management system
6.5 Decision support system
7 Information security
7.1 General requirements
7.2 System security
7.3 Network security
7.4 Application security
Explanation of wording in this standard
List of quoted standards
1 General provisions
2 Basic requirements
2.1 Seismic precautionary classification
2.2 Structural system
2.3 Isolation and energy-dissipation
2.4 Materials and construction
3 Geotechnical engineering
3.1 General requirements
3.2 Liquefaction evaluation
3.3 Subsidence seismic evaluation
3.4 Active fault
4 General plan and outside road
4.1 Site selection
4.2 General plan layout
4.3 Road and bridge
5 Underground engineering
5.1 General requirements
5.2 Mine support
5.3 Emergency exit
5.4 Underground main drainage
5.5 Hoist facilities
6 Ground engineering
6.1 General requirements
6.2 Head frame
6.3 Shaft tower
6.4 Hoist building
6.5 Lodge room
7 Preparation plant engineering
7.1 Process layout
7.2 Building Structure
7.3 Details of design
7.4 Trestle bridge
7.5 Coal bunker
8 Power supply distribution and integrated informatization
8.1 General requirements
8.2 Power distribution
8.3 The installation of power distribution equipment
8.4 Integrated informatization
9 Water supply and drainage,heating and gavS vStorage and distribution
9.1 Source of water
9.2 Water supply and drainage
9.3 Heating
9.4 Gas storage and distribution
Explanation of wording in this code
List of quoted standards
1 General provisions
2 Basic requirements
3 Raw coal receive and storage
3.1 Receive coal
3.2 Raw coal storage
4 Screening,impurity extraction and crushing
4.1 Screening
4.2 Impurity extraction
4.3 Crushing
5 Coal preparation
5.1 General requirements
5.2 Jigging
5.3 Dense medium separation
5.4 Froth flotation
5.5 Other coal preparation methods
6 Dewatering,freeze-proofing and dryihg
6.1 Dewatering
6.2 Freeze-proofing and drying
7 Coal slurry processing
7.1 Coal slugy Gonveying and coarse slime hydraulic classification
7.2 Setting and thickening for slimes slurry
7.3 Slurry processing
8 Storing and loading for coal production
9 GeneraPutilization of reject and coal slurry
10 Measure and examination of coal
11 Repairing for electro-mechanical
12 General layout
13 Surface transportation
13.1 General requirements
13.2 Selection of transportation modes
13.3 Railway transportation
13.4 Road transportation
13.5 Other transportation modes
14 Electric
14.1 Power supply
14.2 Power distribution
14.3 Lighting
14.4 Lightning protection and grounding
14.5 Control
14.6 Automation
14.7 Monitoring and protecting
14.8 Communication
14.9 Industrial television system
14.10 Control network and computer information management system
15 Water supply and drainage
15.1 Source of water
15.2 Outdoor water supply and drainage
15.3 Indoor water supply and drainage
16 Heating and ventilation
16.1 Heating
16.2 Ventilation and dust extraction
16.3 Heat-supply pipeline in outdoor
17 Buildings and structures
17.1 General requirements
17.2 Main buildings
17.3 Ancillary buildings
18 Techno-economy
18.1 General requirements
18.2 Manpower quota
18.3 Investment estimation and budget estimption
18.4 Economic evaluation
18.5 Technical and economic comprehensive evaluation
Appendix A Index of ancillary building area for coal preparation plant
Explanation of wording in this code
List of quoted standards
1 General provisions
2 Terms
3 Basic requirements
4 Allowable value of vibration of precision instrument and equipment
4.1 General requirements
4.2 Allowance value of vibration
5 Planning and design
5.1 General requirements
5.2 Anli-microvibration distance
5.3 Plant layout
6 Anti-microvibration of building structures
6.1 General requirements
6.2 Anti-microvibration measures
6.3 Microvibration checking calculation
7 Isolation design
7.1 General requirementst
7.2 Active isolation
7.3 Passive isolation
8 Acceptance of constructional quality of anti-microvibration engineering
8.1 General requirements
8.2 Acceptance of coiutfructional quality of foundation treatment
8.3 Accfptfnce ot constfructional quality of cubage conctete anti-microvibration foundation
8.4 ofconstructionalqualityofstructure of anrl-microvibration engineering
8.5 Acceptance of constructional quality of isolation engineering of precision instrument and equipment
8.6 Acceptance of constructional quality of isolation engineering of power equipment and pipe
8.7 Acceptance of constructional quality of anti-microvibration engineering
Appendix A Microvibration testing analysis
Appendix B Superposition calculation of different and multiple sources vibration
Explanation of wording in this code
List of quoted standards