DL5190.9-2012
1
1 General Provisions
12
2 Terms
13
3 Basic Requirements
16
3.1 Technical Managelnent Requirements
16
3.2 Construction Measurement and settlement observation
19
3.3 Construction in Rainy season and Flood season
21
3.4 Winter Construction
24
3.5 safety Construction
24
3.6 Green Construction
25
4 Earthworks,Rockworks and Foundation Works
27
4.1 General Requirements
27
4.2 Dewatering and Drainage Construction
28
4.3 Foundation Pit Excavation and supporting
33
4.4 Pit Backfilling
36
4.5 Cofferdam
38
5 Hydraulic Concrete
45
5.1 General Requirements
45
5.2 Materials
46
5.3 Mixing Proportion
52
5.4 Test and Construction Inspection
55
5.5 split Bolts
56
5.6 Construction Joints
57
5.7 Deformation Joint
61
5.8 Water stop
62
5.9 Post-Cast strip
63
5.10 wall Pipe(Box)
65
5.11 Embedded Parts
68
6 Cooling Tower
70
6.l General Requirements
70
6.2 Foundation Engineering
72
6.3 Diagonal Co1umn Works
74
6.4 Cylinder wall Works
75
6.5 Tower Core Works
83
6.6 Auxiliary Works
84
6.7 other cooling Towers
85
6.8 Construction safety
87
6.9 Technical Documents
88
7 surface Watcr Intake Building(Structures)and Pump Houses
89
7.1 General Requirements
89
7.2 0pen Caisson
90
7.3 Pump House and Water Intake
100
7.4 Technical Documents
102
8 Groundwater Intake Buildings (structures)
103
8.1 General Requirements
103
8.2 Tube Well
103
8.3 Large-opening Wells and Infiltration Trenches
110
8.4 Technical Documents
118
9 Delivery Pipes,Drainage Pipes,Trenches and Channels
119
9.1 General Requirements
119
9.2 Trench Excavation and Pipe Foundation Construction
120
9.3 Concrete Pipe
124
9.4 steel Pipe and G1ass Reinforced P1astic Pipe
130
9.5 Reinforced Concretc Trench
132
9.6 Pipe Function Test
132
9.7 Water supply and Drainage Culvert and Channe1
140
9.8 Technical Document Information
143
10 Water Treatment Buildings(structures)
144
lO.1 General Requirements
144
10.2 Pool Body
145
10.3 We11s
147
10.4 Anti-corrosion of Buildings(structures)
150
10.5 Technical Documents
160
11 Hydraulic Ash pipe,Trcnch and Ash-Water Recycling Pipes
161
11.1 General Requirements
161
11.2 Buttresses and Racks
161
11.3 Mortar Pipes
162
11.4 Ash-Water Recycling Pipes
163
11.5 Ash s1uicing Canals
164
11.6 Technical Documents
165
12 Ash storage Yard
166
12.1 General Requirements
166
12.2 Measurement
166
12.3 Drainage and F1ood Prevention
170
12.4 Treatment of Dam Foundation and Bank slope
171
12.5 Dam Materials
174
12.6 Dam body filling
187
12.7 Dam Construction Joint and Joint Treatment
197
12.8 Inverted Fi1ter and Drainage Facilities
200
12.9 Dam Crest and slope Protecton
205
12.10 settings and observation of safety Monitoring Facilities of Dam Body
206
12.11 Dry Ash storage Yard
208
12.12 supporting Facilities
209
12.13 Technical Documents
209
13 0ther Engineering
210
13.l outdoor Watcr supp1y and Drainage Engineering
210
13.2 Watcr supply Pipeline Engineering of Recycled Water and Coalmine Drainage Water
211
13.3 seawater Desalination station
212
13.4 Technical Documents
213
Appendix A General Technica1 Documents
214
Appendix B Reference Table for selection of Foundation Pit Excavation schemes of Pump House
216
Appcndix C Fu1l-Water Test for Pool
218
Appendix D Walkaround Inspection Records of Ash Dam
222
Appendix E Treament Records of Dam Foundation and Bank slope
223
Explanation of Woording in This specification
224
List of Quoted standards
225
图书评论