• DL5190.9-2012
  • 1 General Provisions
  • 2 Terms
  • 3 Basic Requirements
  • 3.1 Technical Managelnent Requirements
  • 3.2 Construction Measurement and settlement observation
  • 3.3 Construction in Rainy season and Flood season
  • 3.4 Winter Construction
  • 3.5 safety Construction
  • 3.6 Green Construction
  • 4 Earthworks,Rockworks and Foundation Works
  • 4.1 General Requirements
  • 4.2 Dewatering and Drainage Construction
  • 4.3 Foundation Pit Excavation and supporting
  • 4.4 Pit Backfilling
  • 4.5 Cofferdam
  • 5 Hydraulic Concrete
  • 5.1 General Requirements
  • 5.2 Materials
  • 5.3 Mixing Proportion
  • 5.4 Test and Construction Inspection
  • 5.5 split Bolts
  • 5.6 Construction Joints
  • 5.7 Deformation Joint
  • 5.8 Water stop
  • 5.9 Post-Cast strip
  • 5.10 wall Pipe(Box)
  • 5.11 Embedded Parts
  • 6 Cooling Tower
  • 6.l General Requirements
  • 6.2 Foundation Engineering
  • 6.3 Diagonal Co1umn Works
  • 6.4 Cylinder wall Works
  • 6.5 Tower Core Works
  • 6.6 Auxiliary Works
  • 6.7 other cooling Towers
  • 6.8 Construction safety
  • 6.9 Technical Documents
  • 7 surface Watcr Intake Building(Structures)and Pump Houses
  • 7.1 General Requirements
  • 7.2 0pen Caisson
  • 7.3 Pump House and Water Intake
  • 7.4 Technical Documents
  • 8 Groundwater Intake Buildings (structures)
  • 8.1 General Requirements
  • 8.2 Tube Well
  • 8.3 Large-opening Wells and Infiltration Trenches
  • 8.4 Technical Documents
  • 9 Delivery Pipes,Drainage Pipes,Trenches and Channels
  • 9.1 General Requirements
  • 9.2 Trench Excavation and Pipe Foundation Construction
  • 9.3 Concrete Pipe
  • 9.4 steel Pipe and G1ass Reinforced P1astic Pipe
  • 9.5 Reinforced Concretc Trench
  • 9.6 Pipe Function Test
  • 9.7 Water supply and Drainage Culvert and Channe1
  • 9.8 Technical Document Information
  • 10 Water Treatment Buildings(structures)
  • lO.1 General Requirements
  • 10.2 Pool Body
  • 10.3 We11s
  • 10.4 Anti-corrosion of Buildings(structures)
  • 10.5 Technical Documents
  • 11 Hydraulic Ash pipe,Trcnch and Ash-Water Recycling Pipes
  • 11.1 General Requirements
  • 11.2 Buttresses and Racks
  • 11.3 Mortar Pipes
  • 11.4 Ash-Water Recycling Pipes
  • 11.5 Ash s1uicing Canals
  • 11.6 Technical Documents
  • 12 Ash storage Yard
  • 12.1 General Requirements
  • 12.2 Measurement
  • 12.3 Drainage and F1ood Prevention
  • 12.4 Treatment of Dam Foundation and Bank slope
  • 12.5 Dam Materials
  • 12.6 Dam body filling
  • 12.7 Dam Construction Joint and Joint Treatment
  • 12.8 Inverted Fi1ter and Drainage Facilities
  • 12.9 Dam Crest and slope Protecton
  • 12.10 settings and observation of safety Monitoring Facilities of Dam Body
  • 12.11 Dry Ash storage Yard
  • 12.12 supporting Facilities
  • 12.13 Technical Documents
  • 13 0ther Engineering
  • 13.l outdoor Watcr supp1y and Drainage Engineering
  • 13.2 Watcr supply Pipeline Engineering of Recycled Water and Coalmine Drainage Water
  • 13.3 seawater Desalination station
  • 13.4 Technical Documents
  • Appendix A General Technica1 Documents
  • Appendix B Reference Table for selection of Foundation Pit Excavation schemes of Pump House
  • Appcndix C Fu1l-Water Test for Pool
  • Appendix D Walkaround Inspection Records of Ash Dam
  • Appendix E Treament Records of Dam Foundation and Bank slope
  • Explanation of Woording in This specification
  • List of Quoted standards