住房和城乡建设部2021年第11号:关于发布《纤维增强塑料设备和管道工程技术规范》等7项工程建设标准英文版的公告现行
资源类型:政策法规
发布日期:2021-01-25
实施日期:2021-01-25
废止日期:-
入库日期:2022-05-25
主编单位:
收藏
- 简介
- 目录
中华人民共和国住房和城乡建设部公告2021年第11号
1
1 General provisions
6
2 Terms
7
3 Basic requirements
8
3.1 General requirements
8
3.2 Functional requirements
8
3.3 Design conditions and documents
9
3.4 Overpressure protection
9
4 Materials
11
4.1 General requirements
11
4.2 Raw materials
11
4.3 Material properties of lamina and laminate
13
5 Equipment design
24
5.1 General requirements
24
5.2 Load and action
25
5.3 Structural calculation
26
5.4 Structural design
48
6 Piping design
58
6.1 General requiren
58
6.2 Configuration deslg
59
6.3 Structure calculation
70
6.4 Piping stress calculation and flexibility analysis
81
7 Manyfacture
92
7.1 General requirements
92
7.2 Manufecture for equipment and piping
93
7.3 Quality control of manufacture process
94
7.4 Fault and repair
95
7.5 Secondary bonding
96
8 Quality control and inspection
98
8.1 General requirements
98
8.2 Quality inspection documents
98
8.3 Raw material testing and inspection
99
8.4 Product measurement,inspection and determination
102
9 Marking,packing,transporting,storing
111
9.1 Equipment
111
9.2 Piping
112
10 Installation
113
10.1 General requirements
113
10.2 Equipment installation
113
10.3 Piping installation
114
10.4 Usage and maintenance
117
11 Project acceptance
119
Appendix A Sub-item design factor K2's determination for corrosion-resistant inner liner layer of fibre reinforced plastics equipment
121
Appendix B Corrosion medium classification
126
Appendix C Horizontal vessel design
127
Appendix D Flange design
135
Appendix E Ground anchor design
143
Appendix F Reinforced flange's specification for opening hole tank top
153
Appendix G Calculating process for pipeline structure design
154
Appendix H Calculating of piping pressure loss
155
Appendix J Secondary bonding fabrication evaluation
157
Appendix K Measurement and test for inter laminar shear strength of laminates
159
Appendix L Measurement and test for lap shear strength of bond between laminates
160
Explanation of wording in this code
161
List of quoted standards
162
1 General provisions
166
2 Terms and symbols
167
2.1 Terms
167
2.2 Symbols
167
3 Basic requirements
169
4 Aseismatic measures appraisal
171
4.1 Power transformers
171
4.2 Vertically installed three-phase reactors
172
4.3 Circuit breakers and arresters
172
4.4 Capacitor groups (cabinets)
173
4.5 Electric porcelain equipment
174
4.6 Battery
174
4.7 Panels,cabinets,distribution boxes
175
5 Aseismatic calculations
177
5.1 Calculation of earthquake action
177
5.2 Floor dynamic magnificationfactor
180
5.3 Power transformers
180
5.4 Vertically installed three-phase reactors
184
5.5 Circuit breakers and arresters
186
Appendix A Shock-absorbing measures for electrical equipment
189
Appendix B Aseismatic measures for vertically installed three-phase reactors
191
Appendix C Calculation of earthquake action of electrical equipment on floor
194
Explanation of wording in this standard
196
1 General provisions
199
2 Basic engineering design
200
2.1 General specification
200
2.2 Process
201
2.3 Piping
205
2.4 Equipment
207
2.5 General plot plan and transportation
208
2.6 Instrumention control
213
2.7 Electrical
216
2.8 Telecommunication
217
2.9 Architecture
221
2.10 Structure
223
2.11 Heating and ventilation
225
2.12 Chemical analysis
226
2.13 Fire-fighting
227
2.14 Water supply and drainage
228
2.15 Cost estimation
230
2.16 Fire-fighting design report
231
2.17 Environmental protection design report
232
2.18 Safety fadli^designreport
234
2.19 Occupation health design report
236
2.20 Seismic design report
238
2.21 Energy-saving design report
240
3 Detail engineering design
242
3.1 Proems
242
3.2 Piping
242
3.3 Equipment
244
3.4 General plot plan and transportation
245
3.5 Instrumention control
247
3.6 Electrical
250
3.7 Telecommunication
252
3.8 Architecture
253
3.9 Structure
255
3.10 Heating and ventilation
261
3.11 Chemical analysis
261
3.12 Fire-fighting
262
3.13 Water supply and drainage
263
Explanation of wording in this standard
265
1 General provisions
270
2 Terms
271
3 Basic requirements
272
4 Site and soil foundation
273
5 Processing equipment
274
5.1 Industry furnace
274
5.2 Vertical vessel
275
5.3 Vertical storage tank
276
5.4 Gas holder
277
5.5 Spherical tank
277
5.6 Heat-exchange equipment and horizontal vessel
278
5.7 Aircooler
279
5.8 Reaction kettle equipment
280
5.9 Chlorin-alkali electrolysis equipment
281
6 Process piping
283
6.1 Non-buried piping
283
6.2 Buried piping
283
7 General machinery
285
7.1 Machine equipment
285
7.2 Comprenossor
286
8 Powwarifl dynamic equipment
287
8.1 Boiler
287
8.2 Turbine,flue gas expander
288
8.3 Generator,electric motor
289
9 Chemical fibre equipment
291
9.1 Chemical fibre machine
291
9.2 Spinning machine
291
9.3 Pelletizer
292
9.4 Tension film machine
293
9.5 Wiredrawing
293
9.6 Braider
294
9.7 Compress
294
10 Instrument,apparatus and computer (control) system
296
10.1 Site instrument
296
10.2 Indoor instrument and control system
296
10.3 Apparatus of laboratory and labouratory
297
10.4 Computer (control)system
298
11 Electric and telecomunication equipment
300
11.1 Power transformer and petersen coil
300
11.2 Reactor
300
11.3 Oil switch and lightning arrester
301
11.4 Power capacitor,disconnecting switch,stick insulator,current (voltage)transformer
302
11.5 Battery pack
303
11.6 High-voltageswitch gear,low-voltage distribution pane,control (protective)panel,DC system panel and distributing box
303
11.7 Power cable,communication line and overhead line
304
11.8 Telecomunications equipments
304
12 Building
306
12.1 Masonry building
306
12.2 Reinforced concrete building
306
12.3 Inner frame and bottom-frame building
307
12.4 Steel and reinforced concrete bent structure building
308
12.5 Single-vStorey frame-bent brick column structure building
309
13 Other special structures
311
13.1 Frame-bent structure
311
13.2 Piperack,pipesleepcr
311
13.3 Shaft tower structure
312
13.4 Water tank
313
13.5 Cooling tower
313
13.6 Pelletizing tower
314
13.7 Chimney
314
13.8 Reinforced concrete silo
315
14 Onshore drillrilling platform
317
14.1 Drilling dquipment
317
14.2 Drilling contents equipment set
318
14.3 Well control device
319
14.4 Well hole
319
15 Offshore platform
321
15.1 Stationary platform
321
15.2 Bottom founded rig
321
15.3 Jackup rig
322
15.4 The main equipment
323
16 Ground production facilities
325
16.1 Beam pumping unit
325
16.2 Blue elephant
325
16.3 Oil wellhead assembly
326
16.4 Gas wellhead assembly
327
Appendix A Estimate of direct economic loss for earthquake destruction in petrochemical engineering
328
Explanation of wording in this standard
330
1 General provisions
334
2 Terms
335
3 Basic requirements
336
4 Site selection and general layout
338
4.1 Selection of factory site
338
4.2 General layout
338
5 Design of environmental protection in procedures
340
5.1 Ore mining
340
5.2 Ore dressing
341
5.3 Stock yard
341
5.4 Sintering and pelletizing
342
5.5 Coking
343
5.6 Ironmaking
346
5.7 Steelmaking and continuous casting
347
5.8 Steel rolling and metal products
349
5.9 Metallurgical lime and refractory material
350
5.10 Ferroalloy
351
5.11 Carbon
352
5.12 Public and auxiliary facilities
353
5.13 Centralized environmental protection facilities
356
6 Division of enviromental protection facilities
357
Appendix A Contents of environmental prolection facilities in each production procedure of iron and steel enterprise
358
Explaiwlion of wording in this code
363
List of quoted standards
364
1 General provisions
368
2 Terms
369
3 Basic requirements
370
4 Design of comprehensive utilization of procedure resources
371
4.1 Ore mining
371
4.2 Ore dressing
371
4.3 Raw material yard
372
4.4 Sintering and pelletizing
372
4.5 Coking
372
4.6 Ironmaking
374
4.7 Steelmaking and continuous casting
374
4.8 Steel rolling and metal products
375
4.9 Metallurgical lime and refractory material
376
4.10 Ferroalloy
376
4.11 Carbon
377
4.12 Public and auxiliary facilities
377
Explanation of wording in this code
379
List of quoted standardil
380
1 General provisions
385
2 Terms
387
3 Tailings pond
390
3.1 Site selection
390
3.2 Storage capacity
390
3.3 Class of tailings pond and grade of corresponding structures
391
3.4 Monitoring facilities
392
3.5 Auxiliary facilities
393
4 Tailings dam
394
4.1 General requirements
394
4.2 Minimum free height and beach width of deposirod beach
395
4.3 Requirements and measures for seepage control
396
4.4 Stability calculation
397
4.5 Construction requirements
401
4.6 Construction of centerline embankment and downstream embankment
402
5 Dry-stacking of tailings
403
5.1 General requirements
403
5.2 Tailings dewatering equipment selection
403
5.3 Dry tailing discharging and stacking method
403
5.4 Dry tailing transportation, leveling and compaction
404
5.5 Key calculation points of dry-stacking tailings dam slope sability
404
5.6 Flood discharge design for dry-stacking tailings pond
404
5.7 Othenlechnical requirements for dry-stacking tailings pond
405
5.8 Determination of filtering plant location
405
6 Flood drainage design of tailings pond
406
6.1 General requirements
406
6.2 Hydrological, hydraulic flood regulation calculation
407
6.3 Structures for flood drainage
408
7 Closure design for tailings pond
410
8 Tailings extraction
411
9 Reclaimed water of tailings pond
412
10 Thickening of tailings slurry
413
11 Delivery of tailings slurry
416
11.1 General requirements
416
11.2 Hydraulic calculation
416
11.3 Pipe and channel laying
418
11.4 Pipe and channel material and accessory device
421
12 Tailings slurry pump station
422
12.1 General requirements
422
12.2 Slurry tank and clean water tank
422
12.3 Equipment selection and configuration
423
12.4 Pump station configuration
426
12.5 Power supply,communication and other facilities
428
13 Environmental protection measures of tailings facilities
429
13.1 General requirements
429
13.2 Seepage control design for tailings pond environmental protection
429
13.3 Other environmental protection measures of tailings facilities
431
Appendix A Classification list of fresh tailings
432
Appendix B Determination method for the tailings deposited beach slope
433
Appendix C Average physical mechanical property indices of tailings dam material
434
Appendix D Estimation formula of sediment volume washed by the heaviest flood at one time for landslide dam
435
Appendix E Tests of tailings slurry delivery
436
Explanation of wording in this code
437
List of quoted standards
438