中华人民共和国住房和城乡建设部公告2023年第45号
1 General provisions
2 Terms
3 Basic requirements
4 Cable containment installation and inspection
4.1 General requirements
4.2 Cable containment laying
4.3 Connector and end of cable containment
4.4 Cable tray installation
5 Cable laying and tevSting
5.1 General requirements
5.2 Cable laying
5.3 Cable entry
5.4 Cable connection
5.5 Testing of cable characteristics
6 Equipment installation and wiring
6.1 General requirements
6.2 Station Terminal Equipment installation
6.3 Machine room equipment installation
6.4 Equipment wiring
7 Ticket and Ticket Reader-Writer
7.1 General requirements
7.2 Testing of ticket and Ticket Reader-Writer
8 Station Terminal Equipment
8.1 General requirements
8.2 Automatic Ticket Vending Machine
8.3 Booking Office Machine
8.4 Automatic Gate Machine
8.5 Automatic Value-adding Machine, Automatic Ticket Checking Machine,Portable Ticket Checking Machine
9 Station Computer System
9.1 General requirements
9.2 LAN of the Station Computer System
9.3 Testing of the Station Computer System basic function
9.4 Testing of emergency buttons
10 Central Computer System
10.1 General requirements
10.2 LAN of the Central Computer System
10.3 Testing of the Central Computer System basic function
11 Central Clearing System
11.1 General requirements
11.2 LAN of the Central Clearing System
11.3 Testing of the Central Clearing System basic function
11.4 Testing of the disaster tolerance system basic function
11.5 Testing of the networked interconncctivity
12 Power supply’earthing and lightning protection
12.1 General requirements
12.2 Power supply equipment installation
12.3 Farthing and lightning protection
12.4 Testing of power supply equipment
13 AFC system commissioning and acceptance testing
13.1 General requirements
13.2 Acceptance of system commissioning and testing
14 Quality of External Appearance of project
14.1 General requirements
14.2 Quality of External Appearance of cable containment
14.3 Quality of External Appearance of equipment and wiring
Appendix A Sub-project,component, inspection and inspection item
Appendix B Construction quality management inspection and acceptance record of AFC system
Appendix C Quality acceptance record of project
Explanation of wording in this standard
List of cited standards