• 中华人民共和国住房和城乡建设部公告2022年第43号
  • 1 General provisions
  • 2 Terms
  • 3 Basic requirements
  • 4 Process
  • 4.1 General requirements
  • 4.2 Basic process and cooperation in production
  • 4.3 Equipment allocation
  • 4.4 Process regionalization and equipment layout
  • 4.5 Air cleanliness requirements of workshop
  • 5 General layout
  • 5.1 General requirements
  • 5.2 Master layout
  • 5.3 Vertical design
  • 5.4 Traffic organization
  • 5.5 Greening design
  • 6 Architecture
  • 6.1 General requirements
  • 6.2 Fire protection design
  • 6.3 Anticorrosion design
  • 7 Structure
  • 7.1 General requirements
  • 7.2 Structure design
  • 8 Dynamic
  • 8.1 Cold and heat sources
  • 8.2 Gas supply
  • 9 Heating, ventilation and air purification
  • 9.1 General requirements
  • 9.2 Ventilation and exhaust gas management
  • 9.3 Air conditioning and purification
  • 9.4 Anti-smoke exhaust
  • 10 Water supply and drainage
  • 10.1 General requirements
  • 10.2 General water supply and drainage
  • 10.3 Purified water
  • 10.4 Industrial recycling cooling water
  • 10.5 Wastewater treatment
  • 10.6 Fire water supply and deployment of fire extinguisher
  • 11 Electric
  • 11.1 General requirements
  • 11.2 Power supply system
  • 11.3 Electric lighting
  • 11.4 Lightning protection andgrounding
  • 11.5 Communication and control
  • 11.6 Electro-static prevention
  • 12 Chemicals
  • 12.1 General requirements
  • 12.2 Storage of chemicals
  • 12.3 Pipeline transportation of chemicals
  • 12.4 Collection and recycling of chemical waste
  • 13 Space management
  • 14 Energy conservation
  • 14.1 General requirements
  • 14.2 Energy conservation of cold-heat system
  • 14.3 Energy conservation of equipment
  • 14.4 Energy saving in electric
  • 14.5 Other energy saving measures
  • Appendix A Typical production process of PCB
  • Appendix B Cleanliness level recommended list of production process of PCB
  • Explanation of wording in this code
  • List of quoted standards
  • 1 General provisions
  • 2 Mine resources/reserves,designed production capacity and service life
  • 2.1 Mine resources/reserves
  • 2.2 Mine designed production capacity and service life
  • 3 Minefield development
  • 3.1 Development mode
  • 3.2 Shaft location and division of mining levels
  • 3.3 Layout of development roadways
  • 3.4 Mining sequence and division of mining districts
  • 4 Shaft,shaft bottom and chambers
  • 4.1 Shaft
  • 4.2 Shaft bottom
  • 4.3 Main chambers
  • 5 Underground mining
  • 5.1 Layout of mining district
  • 5.2 Mining method and technology
  • 5.3 Layout of roads in mi^^istricts
  • 5.4 Roadway drivage and its mechanization
  • 6 Underground transportation
  • 6.1 General requirements
  • 6.2 Coal transportation
  • 6.3 Auxiliary transportation .
  • 6.4 Transportation equipment and vehicle allocation .
  • 7 Ventilation and safety
  • 7.1 Ventilation
  • 7.2 Gas aspiration
  • 7.3 Underground fire prevention
  • 7.4 Prevention of mine heat damage
  • 7.5 Underground emergency refuge system
  • 8 Main mine fixed equipment
  • 8.1 Hoisting equipment
  • 8.2 Ventilation equipment
  • 8.3 Dewatering equipment
  • 8.4 Air compressing equipment
  • 8.5 Gas aspiration equipment
  • 8.6 Nitrogen injection equipment
  • 9 Surface production system
  • 9.1 General requirements
  • 9.2 Shaft head layout
  • 9.3 Shaft head coal bunker
  • 9.4 Screening,rock pick out and crushing
  • 9.5 Belt conveyor transportation
  • 9.6 Storage and loading
  • 9.7 Weighing and coal quality inspection
  • 9.8 Disposal of rock and dirty coal
  • 9.9 Mine repairing workshop and timber processing room
  • 10 General layout
  • 10.1 Mine surface general layout
  • 10.2 Industrial compound plan layout
  • 10.3 Flood control and vertical design
  • 10.4 Inside transportation
  • 10.5 Comprehensive layout of pipelines
  • 11 Surface transportation
  • 11.1 General requirements
  • 11.2 Railway with standard gauge
  • 11.3 Outside roads
  • 12 Power supply and distribution
  • 12.1 General requirements
  • 12.2 Power supply source
  • 12.3 Voltage and electric power quality
  • 12.4 Electric load
  • 12.5 Surface power distribution
  • 12.6 Underground power distribution
  • 12.7 Lighting
  • 12.8 Lighting protectiln,overvoltage protection and earthing
  • 13 Information and automation
  • 13.1 General requirements
  • 13.2 Monitoring and automation
  • 13.3 Computer network
  • 13.4 Information management
  • 13.5 Communication
  • 13.6 Signaling
  • 14 Surface structure
  • 14.1 General requirements
  • 14.2 Main industrial buildings and structures
  • 14.3 Construction area
  • 15 Water supply,water drainage,heat supply and ventilation
  • 15.1 Water sources
  • 15.2 Water supply and drainage
  • 15.3 Underground fire fighting water spray
  • 15.4 Heat supply and ventilation
  • 15.5 Mine shaft freeze-proof
  • 15.6 Boiler room
  • 15.7 Mine gas utilization and fuel gas
  • 16 Energy saving and emission reduction
  • 16.1 General requirements
  • 16.2 Minefield development and mining
  • 16.3 Main mine equipment
  • 16.4 Energy saving of safety facilities
  • 16.5 Electric energy saving
  • 16.6 Energy saving of surface production system
  • 16.7 Energy saving of architecture and general layout and surface transportation
  • 16.8 Energy saving of water supply and drainage, heating and ventilation
  • 16.9 Energy saving of environment facilities
  • 16.10 New energy sources
  • 16.11 Energy measuring and consumption index
  • 16.12 Comprehensive utilization
  • 17 Environment protection
  • 17.1 General requirements
  • 17.2 Pollution control
  • 17.3 Ecological protection
  • 18 Construction period
  • 18.1 Standard of turn-over
  • 18.2 Construction progress
  • 18.3 Construction period
  • Appendix A Classification of solid mineral resources
  • Appendix B Coal resources/reserves estimation index
  • Appendix C Classification and calculation of resources/reserves in prefeasibility study, feasibility study and preliminary design of mitie
  • Appendix D Proposed ratio of resources/reserves
  • Explanation of wording in this code
  • List of quoted standards
  • 1 General provisions
  • 2 Terms and symbols
  • 2.1 Terms
  • 2.2 Symbols
  • 3 General requirements
  • 4 Materials
  • 4.1 Concrete
  • 4.2 Steel reinforcement
  • 4.3 Steel products
  • 4.4 Glass fiber reinforced plastics
  • 4.5 Other commonly used materials
  • 5 Shaft equipments
  • 5.1 Plane layout of shaft
  • 5.2 Steel rope guidef
  • 5.3 Rigid guide and bunton
  • 5.4 Ladderway
  • 5.5 Overfalling protection and cage-stabilizing
  • 5.6 Pipeline and cable laying
  • 5.7 Corrosion zand protection of shaft equipment
  • 6 Shaft support
  • 6.1 General requirements
  • 6.2 Shaft support by conventional shaft sinking method
  • 6.3 Shaft support byfreeze sinking method
  • 6.4 Shaft support by shaft drilling method
  • 6.5 Shaft support bycaisson sinking method
  • 6.6 Shaft support bycurtain sinking method
  • 7 Chamber
  • 7.1 Ingate
  • 7.2 Shaft coal bunker and skip loading chamber
  • 7.3 Skip shaft scattered coal cleaning chamber
  • 7.4 Cage shaft sump and cleaning
  • 7.5 Ventilation shaft mouth and shaft sump
  • Appendix A Calculation for internal force and bearing capacity of concrete shaft lining
  • Appendix B Calculation for shaft lining affected by hoist tower headframe
  • Appendix C Connection and calculation for flange plate
  • Appendix D Calculation for circumferential internal force and reinforcementof shaftlining under non-uniform pressure
  • Appendix E Calculation for hemispherical and snick bottom of shaft lining
  • Appendix F Calculation for semielliptical rotary shallow spherical shell bottom of shaft lining
  • Appendix G Calculation for steel-concrete composite shaft linings by shaft drilling method
  • Explanation of wording in this code
  • List of quoted standards
  • 1 General provisions
  • 2 Basic requirements
  • 2.1 Mining limits
  • 2.2 Resources/reserves
  • 2.3 Designed production capacity
  • 2.4 Mode of development and haulage and mining procedures
  • 3 Mining technology
  • 3.1 General requirements
  • 3.2 Intermittent mining technology
  • 3.3 Continuous mining technology
  • 3.4 Semi-continuous mining technology
  • 3.5 Dragline casting mining technology
  • 3.6 Other mining technology
  • 3.7 Blasting hole drilling and blasting
  • 4 Internal transportation
  • 4.1 General requirements
  • 4.2 Truck haulage
  • 4.3 Belt conveying
  • 4.4 Railroad transportation
  • 5 Dump
  • 5.1 General requirements
  • 5.2 Size dumping face
  • 5.3 Duifiping method and equipment selection
  • 6 Slope stability engineering
  • 7 Groundwater control
  • 7.1 General requirements
  • 7.2 Method of groundwater control
  • 7.3 Hydrogeological calculation
  • 7.4 Equipment and affiliated facilities
  • 7.5 Filter
  • 8 Water prevention and drainage
  • 8.1 Drainage in excavation site
  • 8.2 Surface water prevention and drainage
  • 9 Coal handling system
  • 9.1 Production capacity
  • 9.2 Crushing
  • 9.3 Coal storage
  • 9.4 Loading
  • 10 General layout
  • 10.1 General layout of open-pit mine
  • 10.2 General layout of mine service facilities
  • 10.3 Vertical design and flood control anddrainage
  • 10.4 Mine service facilities road
  • 10.5 Comprehensive layout of pipelines yr
  • 11 Maintenance of mechanical and electrical equipment
  • 11.1 General requirements
  • 11.2 Maintenance of mechanical equipment
  • 11.3 Maintenance of electrical equipment
  • 11.4 Warehouses
  • 12 Power supply and distribution
  • 12.1 General requirements
  • 12.2 Source of power supply
  • 12.3 Selection of voltage,quality of power supply and reactive power compensation
  • 12.4 Power load
  • 12.5 Power distribution on surface
  • 12.6 Power distribution to excavation siteand dump
  • 12.7 Power distribution of dewatering and pumping equipment
  • 12.8 Power distribution to productionHated facilities
  • 12.10 Over voltage and grounding
  • 13 Information and automation
  • 13.1 General requirements
  • 13.2 Production monitoring
  • 13.3 Informmanagement
  • 13.4 Communication
  • 13.5 Cable TV system
  • 13.6 Railroad signal
  • 14 Buildfftgs on surface,water supply and drainage
  • 14.1 General requirements
  • 14.2 Crushing station
  • 14.3 Head station (drive station,transfer station),distributing station
  • 14.4 Trestle or underpass of belt conveyor
  • 14.5 Stockyard of run-of-mine coal
  • 14.6 Administration and public buildings
  • 14.7 Water source
  • 14.8 Water supply
  • 14.9 Fire fighting
  • 14.10 Drainage
  • 14.11 Heating
  • 14.12 Ventilation
  • 14.13 Heat supply
  • 15 Energy conservation,emission-reduction and comprehensive utilization
  • 15.1 General requirements
  • 15.2 Energy conservation in development and mining
  • 15.3 Energy conservation in power supply and distribution
  • 15.4 Energy conservation in general layout and transportation
  • 15.5 Energy conservation in architecture
  • 15.6 Energy conservation in water supply and drainage andheat supply and ventilation
  • 15.7 Emission reduction and comprehensive utilization
  • 16 Environment protection
  • 16.1 General requirements
  • 16.2 Pollution control
  • 16.3 Reclamation and water and soil conservation
  • Appendix A Classification of resources/reserves of solid mineral
  • Appendix B Indexes for estimation of coal resources
  • Appendix C Classification and calculation of resources/reserves in prefeasibility feasibility study and preliminary design
  • Explanation of wording in this code
  • List of quoted standards
  • 1 General provisions
  • 2 Terms
  • 3 Basic requirements
  • 4 Requirements of electric power system
  • 4.1 General requirements
  • 4.2 Technical requirementvS for the connection to the power system
  • 4.3 Relay protection and automatic safety equipment
  • 4.4 Dispatching automation system
  • 4.5 System communication
  • 4.6 Electric energy calculation
  • 5 Solar resource assessment
  • 5.1 General requirements
  • 5.2 Reference weather station
  • 5.3 Site observation station
  • 5.4 Validation and analysis of solar radiaticm data
  • 6 Site selection
  • 7 Overall planning
  • 7.1 General requirents
  • 7.2 Off-site planning
  • 7.3 On-site planning
  • 8 Layout of solar field
  • 8.1 General requirements
  • 8.2 Layotn of heliostat
  • 8.3 Layotn of receiver tower
  • 8.4 Safety protection
  • 8.5 Maintenance and overhaul facilities
  • 9 Layout of power block .
  • 9.1 General requirements
  • 9.2 Layout of thermal storage block
  • 9.3 Layout of steam generator block
  • 9.4 Layout of turbine room
  • 9.5 Layout of auxiliary heating block
  • 9.6 Layout of central control room
  • 9.7 Maintenance and overhaul facilities
  • 9.8 Complex facilities
  • 10 Collector system and equipment
  • 10.1 General requirements
  • 10.2 Heliostat
  • 10.3 Receiver
  • 10.4 Heliostat cleaning device
  • 11 Heat transfer,thermal storage and heat exchange system and equipment
  • 11.1 General requirements
  • 11.2 Heat transfer system and equipment
  • 11.3 Thermal storage system and equipment
  • 11.4 Heat exchange system and equipment
  • 11.5 Auxiliary system and equipment
  • 12 Steam turbine equipment and system
  • 12.1 General requirements
  • 12.2 Steam turbine equipment
  • 12.3 Main steam,reheat steam and bypass system
  • 12.4 Feedwater system and feedwater pumps
  • 12.5 Deaerator and feedwater storage tank
  • 12.6 Condensate system and condensed pumps
  • 12.7 Draining and discharge system
  • 12.8 Cooling water system of auxiliary equipment
  • 12.9 Condenser and auxiliary facilities
  • 13 Water treatment equipment and system
  • 13.1 Water quality and water pretreatment
  • 13.2 Water pre-desalination
  • 13.3 Demineralized water treatment smtem
  • 13.4 Condensate polishing system
  • 13.5 Chemical dosing andsampling for thermal cycle system
  • 13.6 Cooling water treatment
  • 13.7 Heliostat cleaning water treatment
  • 13.8 Waste water treatment
  • 13.9 Chenicals storage
  • 14 Information system
  • 14.1 Geiwral requirements
  • 14.2 Overall planning of plant information system
  • 14.3 Management information system
  • 14.4 Safety and protection system
  • 14.5 Production video monitoring system
  • 14.6 Video meeting system
  • 14.7 Cabling of information system
  • 14.8 Information security
  • 15 Instrumentation and control
  • 15.1 General requirements
  • 15.2 Level of automation
  • 15.3 Control mode and control room
  • 15.4 Measurement and instrumentation
  • 15.5 Alarming system
  • 15.6 Protection system
  • 15.7 On-off control
  • 15.8 Modulating control
  • 15.9 Control system
  • 15.10 Control power supply
  • 15.11 Instrument tube,cable andlocal equipment arrangement
  • 16 Electrical equipment and system
  • 16.1 Generator and main transformer
  • 16.2 Main electrical connection
  • 16.3 AC auxiliary power system
  • 16.4 DC system and AC uninterruptible power supply
  • 16.5 High voltage switchgear arrangement
  • 16.6 Electrical monitoring and control
  • 16.7 Electrical component relay protection
  • 16.8 Lighting system
  • 16.9 Grounding system
  • 16.10 In-plant communication
  • 16.11 Other facilities
  • 17 Hydraulic facilities and system
  • 17.1 General requirements
  • 17.2 Water source and water managemenent
  • 17.3 Water supply system
  • 17.4 Water intake building and structure
  • 17.5 Piping and culvert
  • 17.6 Wet cooling tower
  • 17.7 Air cooling system
  • 17.8 Water supply and water drainage
  • 18 Auxiliary system and ancillary facilities
  • 19 Buildings and structures
  • 19.1 General requirements
  • 19.2 SeLsIhic devsign
  • 19.3 Architectural design.
  • 19.4 Ground and foundation
  • 19.5 Main building structure
  • 19.6 Receiver tower structure
  • 19.7 Other buildings and structures in plant
  • 19.8 Hydraulic building and structure
  • 20 Heating ventilation and air conditioning
  • 20.1 General requirements
  • 20.2 Steam generator building
  • 20.3 Electrical building
  • 20.4 Central control room
  • 20.5 Chemical building
  • 20.6 Other buildings
  • 20.7 Heating system and piping network in plant
  • 21 Environmental protection and water and soil conservation
  • 21.1 General requirements
  • 21.2 Pollution source control
  • 21.3 Water and‘soil conservation
  • 22 Occupational health and safety
  • 22.1 General requirements
  • 22.2 Occupational safety
  • 22.3 Occupational health
  • 23 Fire fighting
  • 23.1 General requirements
  • 23.2 Fire risk classifications,fire resistance classifications and fire compartment
  • 23.3 Fire water supply,fire extinguishing facilities and automatic fire alarm
  • 23.4 Power supply and emergency lighting for fire protection
  • Appendix A Estimation of electric output
  • Explanation of wording in this standard
  • List of quoted standards